GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
PRED – MRR Proposals 2012-13 – 609 WORKS COSTING Rs. 20865.12
Lakh for Providing BT Renewal – Administrative sanction – Accorded –
Orders – Issued.
-------------------------------------------------------------------------------------
PANCHAYAT RAJ & RURAL DEVELOPMENT (PROGS.I) DEPARTMENT
G.O.Rt.No. 1840 DATED:05-10-2012.
Read the following:
1) From the ENC, Hyderabad Lr. No. W1/DEE1/BTR/12, dt. 12-06-12.
2) From the ENC, Hyderabad Lr. No. W1/PMGSY/B.T.Renewals/2012
dt. 24-09-2012.
*****
O R D E R:
In the reference 2nd read above the Engineer-in-Chief, PR, Hyderabad
has submitted proposals for BT renewals for 609 road works i.e. 309 works for
PMGSY Roads and 300 works for Non PMGSY Roads for a total amount of
Rs. 20865.12 lakh for the period 2012-13 under Maintenance of Rural Roads Grant
which were completed under PMGSY and Non PMGSY.
2. The proposals have been examined and Government hereby accord
administrative sanction for an amount of Rs. 20865.12 lakh for the period 2012-13
for 609 works as annexed to this order under MRR Grant under the following Head
of Account.
MJH 3054 Roads & Buildings
MH 04 District & Other Roads.
GH 196 Assistance to Zilla Parishads.
SH (12) Assistance to Panchayat Raj
Institutions for Maintenance of Rural Roads.
270 Minor works.
272 Maintenance.
3. The Engineer-in-Chief, PR, Hyderabad is directed to take up Maintenance of
the roads by providing BT Renewals so as to not only protect the BT road assets
already created but also to extend their life. It is further instructed to ensure
durable and good riding surface with the presently sanctioned Maintenance works
duly having necessary quantitative and qualitative checks and executing the works
confirming relevant technical specifications. Propose maintenance of CD works
wherever necessary. Removal of High berms and jungle on the road margins must
be attended. Removal of encroachments etc, in the road margins in towns and
villages, which obstruct flow of rain water wherever necessary may be attended.
4. The Engineer-in-Chief, PR should see that the works are executed within the
administrative sanction amounts and no revision of estimated cost exceeding
administrative sanction will be allowed.
5. The Superintending Engineer, PR, concerned should check and verify that
the works sanctioned in Para 2 above is not already sanctioned/grounded/semi
finished under any other grants. Any discrepancy noticed is to be brought to the
notice of the higher authority immediately who will inform to Government for
further necessary action. The above instructions shall be followed scrupulously. If
such works as sanctioned in this GO are already grounded etc., it may deemed to
have been cancelled automatically and the same may be informed to Government
immediately for taking further necessary action. The technical estimate must be
verified by the concerned Executive Engineer, before grounding the work. Alternate
sanctions will not be entertained.
6. The Engineer-in-Chief PR, Hyderabad shall take necessary action in the matter
accordingly and submit the utilization Certificates to Government soon after
completion of the works in the stipulated time.
P.T.O.
::2::
7. A copy of this order is available on internet and can be accessed at
www.ap.gov.in/goir .
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
C.R. BISWAL
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Engineer-in-Chief, PR, Hyderabad.
Copy to
The Chief Engineer, PR, Hyderabad
The Superintending Engineer, PR Concerned (Through Chief Engineer (PR), Hyd)
The District Treasury Officer, Concerned.
The Director of works and Accounts, Hyderabad
The Accountant General, AP, Hyderabad
The PS to Hon’ble Min. (PR&RWS)
The PS to Principal Secretary (PR).
Sc/sf.
//FORWARDED::BY ORDER//
SECTION OFFICER
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
1 Adilabad Asifabad BT Renewal to R/F PWD Road to
Govindapur.
24.00
2 Adilabad Khanapur BT Renewal to R/F PWD road to
Rampur
20.00
3 Adilabad Khanapur BT Renewal to R/F Kaval to Kothapet 12.00
PMGSY
Roads Total
56.00
1 Adilabad Adilabad BT Renewal to R&B Road to Jamini via
Laxmipur
60.00
2
Adilabad Asifabad
BT Renewal to Road from R&B Road to
Jamda
18.00
3 Adilabad Asifabad BT Renewal to Road from Tadihatnoor
to Gunjala
66.00
4 Adilabad Bellampally BT Renewal to Bellampally Budha
Guest house to Chandravelly
30.00
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
ANNEXURE TO THE G.O.RT. NO. 1840, PR&RD (PROGS.I) DEPT., DT: 05-10-12.
5 Adilabad Bellampally BT Renewal to PWD road to Bugga
Temple via Kannal
35.00
6
Adilabad Boath
BT Renewal to R/F PWD Road to
Mahaduguda (In Km 0/0 to 3/5)
30.00
7 Adilabad Chennur BT Renewal to Road from PWD Road
to Ramakrishnapur Via Kyathanpalli
MPP Mandamarri
43.00
8 Adilabad Chennur BT Renewal to Road from Chennur to
Arjungutta MPP Kotapally
40.00
9
Adilabad Khanapur
BT Renewal to R/F Khanapur to
Tharlapad
20.00
10 Adilabad Mancherial BT Renewal to PWD Road to Dwaraka,
Via.Naspur.
65.00
11 Adilabad Mudhole BT Renewal to Kallur to Gollamadugu
via kuntala
140.00
12 Adilabad Nirmal BT Renewal to PWD road to Dilawarpur 35.00
13 Adilabad Nirmal BT Renewal to PWD road to Mujgi via
Chityal
30.00
14
Adilabad Sirpur(T)
BT Renewal to R/F. Peddabanda to
Jambuga
24.00
15 Adilabad Sirpur(T) BT Renewal to R/F Nazrulnagar
Community Hall to Camp
13.80
Non-PMGSY
Roads Total
649.80
Adilabad Total
705.80
1 Anantapur Dharmavaram BT Renewal to Dharmavaram
toTadimarri via Thummala
60.00
2 Anantapur Guntakal BT Renewal to Devarapalli to
Hanumpalli
23.40
3 Anantapur Hinudpur BT Renewal to HB Road to Kirikera
Weavers Colony
11.00
4 Anantapur Hinudpur BT Renewal to KA Road to
Tummalakunta
10.00
5 Anantapur Kadiri BT Renewal to AP Road to K.Pulakunta 32.00
1
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
6 Anantapur Kalyandurg BT Renewal to Setturu to Chintarlapalli 30.00
7 Anantapur Kalyandurg BT Renewal to Approach road to
Buddaiahdoddi & Gantaiahdoddi
20.00
8 Anantapur Penukonda BT Renewal to Roddam to Dodagatta 40.00
9 Anantapur Puttaparthy BT Renewal to Approach road to
Kandukurivandlapalli
20.00
10 Anantapur Singanamala BT Renewal to Approach road to
Niluvurai
20.00
11 Anantapur Tadipatri BT Renewal to Yadiki to Bayareddypalli
via Chinthalayapalli
16.00
12 Anantapur Tadipatri BT Renewal to Muchukota to
Namanakampalli
13.00
PMGSY
Roads Total
295.40
1 Anantapur Dharmavaram BT Renewal to Dhadithota to 67.58
Chillavaripalli upto mandal limits.
2 Anantapur Guntakal BT Renewal to Gooty to
Nagasamudram road
100.00
3 Anantapur Kalyandurg BT Renewal to Kalyandrug to Mallipalli
via Mudigallu
60.00
4 Anantapur Kalyandurg BT Renewal to Kambadur to
Kotaguddam
60.00
5 Anantapur Puttaparthy BT Renewal to Dharmavaram-Kodur
Road to Iragampalli
35.00
6 Anantapur Rapthadu BT Renewal to C.K. Palli to
Nyamaddala
50.00
7 Anantapur Rapthadu BT Renewal to Atmakur to Peruru in Km
27/0 to 35/0
50.00
8 Anantapur Singanamala BT Renewal to Kotanka to Garladinne-
Penakacherla road in Km 14/0 to 19/0
25.00
9 Anantapur Singanamala BT Renewal to Gugudu to Maddipalli in
Km 4/0 to 14/0
100.00
10 Anantapur Tadipatri BT Renewal to R&B road to
Varadayapalli
36.00
11 Anantapur Uravakonda BT Renewal to Golla to Beluguppa 60.00
Non-PMGSY
Roads Total
643.58
Anantapur
938.98
Total
1 Chittoor Chandragiri BT Renewal to P.N road to Cherlopalle 7.90
2 Chittoor Chandragiri BT Renewal to Pudi to Mundlapudi 12.00
3 Chittoor Chandragiri BT Renewal to P.N road to Settipalle
village road
10.20
4 Chittoor Chandragiri BT Renewal to Karakambadi road to
Mangalam
9.70
5 Chittoor Chandragiri BT Renewal to Rayalacheruvu road to
Papireddilu via Chiguruvada
15.60
6 Chittoor Chittoor BT Renewal to Settinthangal to
Naragallu
23.65
2
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
7 Chittoor Kuppam BT Renewal to Kuppam Vijalapuram to
Battuvaripalli
28.60
8 Chittoor Kuppam BT Renewal to KP road to
Bandasettipalle
11.00
9 Chittoor Kuppam BT Renewal to Soniganipalle road to
Yanamasanapalle
13.20
10 Chittoor Kuppam BT Renewal to Kuppam patchuru road
to Mulakalapalle
13.20
11 Chittoor Madanapalle BT Renewal to MPL-NPL road to
Mustoor
28.60
12 Chittoor Palamaner BT Renewal to Dandapalle road to
Nagireddipalle
26.40
13 Chittoor Piler BT Renewal to VGG Road to Cherlopalli
in KM 0/0-2/0
25.00
14 Chittoor Piler BT Renewal to VGG Road to Cherlopalli
in KM 2/0-10/0
80.00
15 Chittoor Punganur BT Renewal to Sodam Nanjampeta 63.80
road to Pacharimakula via
Yerrathivaripalli and Buragamanda
16 Chittoor Puthalapattu BT Renewal to Diguvamogham to
Nallpareddipalle
27.50
17 Chittoor Puthalapattu BT Renewal to Thumbakuppam to
Perumallapalle
28.60
18 Chittoor Satyavedu BT Renewal to Nagalauram
Vembakamroad to Koltakadu
14.40
19 Chittoor Srikalahasthi BT Renewal to KT Road
toThangellapalem
14.00
20 Chittoor Srikalahasthi BT Renewal to P.N road to
Subbanaidugunta
15.00
21 Chittoor Srikalahasthi BT Renewal to PN road to
Annaswampalle
30.00
22 Chittoor Srikalahasthi BT Renewal to P.N road to Guthivari
Palle
12.00
23 Chittoor Srikalahasthi BT Renewal to P.N. road to
Vedullacheruvu
12.00
24 Chittoor Thamballapalle BT Renewal to PTM Kandukuru road to
Gollapalle
26.40
PMGSY
Roads Total
548.75
1 Chittoor Chandragiri BT Renewal to Nennuru Kammapalli
Road to Kandulavaripalli (via) Kotha
36.00
Nennuru
2 Chittoor Chandragiri BT Renewal to C.Ramapuram to KKV
Puram (via) Diguva Ramapuram
42.00
3 Chittoor Chittoor BT Renewal to Chittoor-Tiruttani Road
to meet MCB Road (via) 197
Ramapuram
75.20
4 Chittoor G.D.Nellore BT Renewal to Chittoor Penumur road
to Meet Nendragunta Penumur road via
Adavipalli and Bandakindapalli
67.00
5 Chittoor Kuppam BT Renewal to Kuppam - Patchuru road
to Vasanadu via Mnakaladoddi
20.00
3
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
6 Chittoor Kuppam BT Renewal to Road from KP road to
Peddabommanapalli
6.00
7 Chittoor Kuppam BT Renewal to KP road to Seegalapalli
via Samaguttapalli
24.00
8 Chittoor Kuppam BT Renewal to Pandyalamadugu -
Chakalakuppam Via Gorivimakulapalli
24.00
9
Chittoor Madanapalle
BT Renewal to Tirupathi road to
Pothapolu road via Buchipalle
16.00
10 Chittoor Madanapalle BT Renewal to Bangalore road to
Ponnetipalem
18.00
11 Chittoor Nagari BT Renewal to The road from
Kosalanaram to Patha Arcot road in
Vijayapuram Mandal
38.00
12 Chittoor Nagari BT Renewal to Road from Vengalathuru
road to Ururupeta via Mangalagiri
Kandriga in Nindra mandal
52.00
13 Chittoor Nagari BT Renewal to Road from Thadukupeta
to Vinayakapuram road via
Melapattu,Tharani in in Nagari mandal
43.00
14
Chittoor Palamaner
BT Renewal to MBT Road to Kotur via
Melmoi&Gundl Palle
10.40
15 Chittoor Piler BT Renewal to Providing B.T.S to the
road from VG road to Gollapalle
38.40
16 Chittoor Piler BT Renewal to K.V Palli road to
Vangimalluvaripalli (via)
Chinthamakulapalli
18.00
17 Chittoor Piler BT Renewal to Ellamanda road to meet
Ellamdna road via Kotapalle
45.00
18 Chittoor Piler BT Renewal to Agraharm-sodam R & B
road to Kammamittapalle
4.00
19
Chittoor Punganur
BT Renewal to MBT road to
Chandramakulapalle
18.00
20 Chittoor Punganur BT Renewal to R/F Thudumvaripalle to
Venkayalavaripalle of Pulicherla Mandal
19.00
21 Chittoor Punganur BT Renewal to PPC road to
Chukkavandlapalle Km 0/0 to 3/100
34.00
22 Chittoor Satyavedu BT Renewal to KP road to Katrapalli
8.40
Y/C
23 Chittoor Satyavedu BT Renewal to P.V.Road to Endrapeta 6.00
24 Chittoor Srikalahasthi BT Renewal to RPK Road to Madibaka 10.80
25 Chittoor Srikalahasthi BT Renewal to Muchivolu road to
Akkurthi
12.00
26
Chittoor Thamballapalle
BT Renewal to Peddamandyam road to
Kayalaallu of Kotala
24.50
Non-PMGSY
Roads Total
709.70
4
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
Chittoor Total
1258.45
1 East Godavari Amalapuram BT Renewal to AY Road to KNF Road
(via) A.Vemavarappadu.
15.00
2 East Godavari Amalapuram BT Renewal to Nadipudi to Varrepalem
of Nallacheruvu (via) Khambampadu.
15.00
3 East Godavari Amalapuram BT Renewal to Sriram Nagar Colony of
Nadipudi to Kambam padu of
Palagummi
20.00
4 East Godavari anaparthy BT Renewal to Kuthukuluru to
Pulagurtha
21.00
5 East Godavari Jaggampeta BT Renewal to Approach road to
Yerrampalem
21.00
6 East Godavari Kothapeta BT Renewal to Palivela-Pallipalem R&B
road to Sarepalem
16.98
7 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada 14.88
R&B road to Pujaripalem
8 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada
R&B road to Jithugapadu
14.18
9 East Godavari P.Gannavaram BT Renewal to B.T Renewals to the
Road from Pappulavaripalem to
Kundalapalli
15.00
10 East Godavari P.Gannavaram BT Renewal to B.T Renewals to the
Road from Z.P.Road to
Chinnamvaripeta of Irusumanda
7.50
11 East Godavari Peddapuram BT Renewal to Tirupathi to Thatiparthi
via Chandramampalli
52.50
12 East Godavari Pithapuram BT Renewal to Jalluru to meet
Samalkota-Uppada R&B road via
Mallam Govindarajupalem
40.50
13 East Godavari Pithapuram BT Renewal to Mallam to meet
Pithapuram Kolanka ZP Road Via
Virawada
21.30
14 East Godavari Prathipadu BT Renewal to -do- L.R.Palem
N.N.Patnam
24.00
15 East Godavari Rajanagaram BT Renewal to Undeswarapuram to
Butchampeta
76.00
16 East Godavari Ramachandrapu
ram
BT Renewal to Kolanka to Pallipalem
road to Corangi canal (Via)
Namavaripalem, Dugguduru, TR Palem
21.00
(Proposed from Kolanka to
Namavaripalem)
17 East Godavari Rampa
chodavaram
BT Renewal to R/f Busigudem to
Tadepalli
56.70
PMGSY
Roads Total
452.53
1 East Godavari Amalapuram BT Renewal to Road from R & B road to
Allavaram to Mamidithota SC colony
20.00
2 East Godavari Amalapuram BT Renewal to Road from R&B road to
Settipeta of Bhathanavalli
21.50
5
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
3 East Godavari Amalapuram BT Renewal to Munipalli to N Kothapalli 32.00
4 East Godavari anaparthy BT Renewal to R&B road to L.N.Puram 15.00
5 East Godavari anaparthy BT Renewal to R/f LN Puram to
Kapavaram
15.00
6 East Godavari Jaggampeta BT Renewal to Gandepalli to Kanupuru 60.00
7 East Godavari Jaggampeta BT Renewal to 29/8 of R& B Road @
Gokavaram to R.Yerrmapalem
42.00
8 East Godavari Kakinada ® BT Renewal to Ganganapalli Village
Road
55.00
9 East Godavari Kakinada ® BT Renewal to Panduru to Namam road 24.00
10 East Godavari Mandapeta BT Renewal to R&B to Nalluru 25.00
11 East Godavari Mummidivaram BT Renewal to KM 81/4 of NH 214 to 75.00
Krapa chintalapudi
12 East Godavari P.Gannavaram BT Renewal to Road from Bellampudi to
Narendrapuram (via)
Adimulamvaripoalem
45.00
13 East Godavari Rajahmundry BT Renewal to Kadiam to Burrilanka Via
Venkayammapeta
29.00
14 East Godavari Ramachandrapu
ram
BT Renewal to Road from Korangi cato
Ithalapudi.
70.00
15 East Godavari Razole BT Renewal to BT Road from
Malikipuram to Visweswarayapuram via
mandal office
15.00
16 East Godavari Razole BT Renewal to R&B road to
Gollavaripeta in Sakhinetipalli
Lanka(V)Sakhinetipalli(M)
16.00
17
East Godavari Tuni
BT Renewal to Tuni Pentakota R & B
road to Kavalapadu
20.00
Non-PMGSY
Roads Total
579.50
East Godavari
Total 1032.03
1 Guntur Bapatla BT Renewal to NH 216 to
Bhavanamvaripalem (Via) Chowdipalem
20.00
2 Guntur Bapatla BT Renewal to MN R&B road to Nattalavaripalem
12.60
3 Guntur Macherla BT Renewal to Veeranjaneyapuram 7th
Mile to Kothur, Macherla (M)
22.00
4 Guntur Narasaraopet BT Renewal to Satuluru to Dondapadu 40.00
5 Guntur Narasaraopet BT Renewal to Chilakaluripet Major to
Nallagarlapadu
30.00
6 Guntur Narasaraopet BT Renewal to Kesanapalli to
P.Turakapalem
38.00
7 Guntur Pedakurapadu BT Renewal to Thammavaram to
Podapadu
20.00
6
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
8 Guntur Prathipadu BT Renewal to Chinalingayapalem to
Kondabalavaripalem
10.00
9 Guntur Sattenapalli BT Renewal to Road from SAP-NRT
road to Paludevaralapadu
17.00
10 Guntur Tadikonda BT Renewal to R/f Vemuluripadu to
Ameenabad
16.00
11 Guntur Tadikonda BT Renewal to R/f MG R&B road to
Lingayapalem
25.00
12 Guntur Tadikonda BT Renewal to R/f MR R&B road to
uddandarayunipalem road to
Uddandarayudupalem
16.00
13 Guntur Tenali BT Renewal to R&B Road to South
Dalithawada of Nandivelugu
13.00
14 Guntur Vemuru BT Renewal to Tenali-Cherukupalli R&B
road @16/8km to yelavarru
15.00
15 Guntur Vinukonda BT Renewal to R&B road to
Brahmanapalli
20.00
16 Guntur Vinukonda BT Renewal to Bandlamotu to
Malapadu
10.00
PMGSY
Roads Total
324.60
1 Guntur Bapatla BT Renewal to NH 216 to Ramnagar
(Via) Putchakurthivaripalem
32.00
2 Guntur Bapatla BT Renewal to Khajipalem - P.V.palem
R&B road to Kothapalem (via)
Parisavaripalem
30.00
3 Guntur Chilakaluripet BT Renewal to Solasa to
Sankuratripadu
60.00
4 Guntur Mangalagiri BT Renewal to TM R & B road at Km
11/8 to
Kolakaluru(via)Manchikalapudi,KR
Konduru
70.00
5 Guntur Narasaraopet BT Renewal to Rompicherla Muppalla
R&B Road to Ramireddypalem
34.00
6 Guntur Narasaraopet BT Renewal to Nrt- Rompicherla R&B
Road to Thungapadu
5.00
7 Guntur Pedakurapadu BT Renewal to R/f Pedakurapadu to
Kannegnadla via Lagadapadu
30.00
8 Guntur Pedakurapadu BT Renewal to Velpur-Madipadu R&B
Road to Zattupalli thanda
30.00
9 Guntur Ponnur BT Renewal to Ponnur - Chnadolu R &
74.00
B road at Km 2/8 to Komali via Jadavalli
10 Guntur Prathipadu BT Renewal to R/f GBC Road to PV
Road
20.00
11 Guntur Repalle BT Renewal to Road from PV Palem -
Nizampatnam R&B Road to
Gattuvaripalem (via)
Satyanarayanapuram,Pedapalli &
Srinagar in Nagaram(M)
88.00
12 Guntur Repalle BT Renewal to Road from 4/7 Gullapalli-
Nagaram R&B road to Pudiwada
46.30
7
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
13 Guntur Sattenapalli BT Renewal to Mupulla to Narnepadu
(via) L.Kurapadu
60.00
14 Guntur Sattenapalli BT Renewal to Road from Golllapadu ot
Dondapadu (via) K.V.Palem
50.00
15 Guntur Tadikonda BT Renewal to GNT - NRT R&B Road
@ Km 26/8 to Kandrika
32.00
16 Guntur Tadikonda BT Renewal to R/F Nudurupadu to
Kandriga, Phirangipuram Mandal
30.00
17 Guntur Tenali BT Renewal to Road from Athota to
Yadavapalem
48.00
18 Guntur Tenali BT Renewal to G.H road to G.H road
(via) Ganganamma temple in Khajipet
17.00
19 Guntur Vemuru BT Renewal to Tenali-Vellaturu R&B
road @13/4 to Penamarru via
Ravikampadu
30.00
Non-PMGSY
Roads Total
786.30
Guntur Total 1110.90
1 Kadapa Badvel BT Renewal to NBB road to C
Boyanapalli
25.60
2 Kadapa Badvel BT Renewal to NBB Road to
Kothacheruvu
52.40
3 Kadapa J.Madugu BT Renewal to Providing BT to the road
from NBB road to Thorrivemula of
Mylavaram Mandal
29.00
4 Kadapa Kamalapuram BT Renewal to CT road to
Venkateswarapuram
19.50
5 Kadapa Kamalapuram BT Renewal to C.P. road to Machunur
via Konayapalli Chennamrajupalli
10.56
6 Kadapa Mydukur BT Renewal to Road from
Bhoomayapalli to Thimmayapalli via
Krishnapuram
23.00
7 Kadapa Rajampet BT Renewal to BT road from Mandapalli
to Adavirachapalli
14.00
8 Kadapa Rayachoty BT Renewal to RV road to Kurnoothala
(Via) Kakulavaram 5/0 to 11/0
34.00
9 Kadapa Rayachoty BT Renewal to Chinnamandem -
Kalibanda road to Chinna Nerusupalli
16.00
PMGSY
Roads Total
224.06
1 Kadapa Badvel BT Renewal to CP Road to Bhakrapeta 23.00
2 Kadapa Kamalapuram BT Renewal to Bayanapalli to
Balasinganapalli
10.00
3 Kadapa Kamalapuram BT Renewal to CK road to Sugar factory 10.00
4 Kadapa Kamalapuram BT Renewal to CT road to
Thollaganganapalli
11.54
5
Kadapa Kodur
BT Renewal to P.C.Road to
Ketharajupalli
24.00
6 Kadapa Kodur BT Renewal to C.K.Road to
Thimmayapalem
36.00
8
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
7 Kadapa Mydukur BT Renewal to Sunkesula to Miduthur 86.00
8 Kadapa Proddatur BT Renewal to Proddatur-Yerraguntla
main road to Nanganurpalli
35.00
9 Kadapa Pulivendula BT Renewal to R.V.Road to
Varikuntapalli, Chakrayapeta (M)
70.00
10 Kadapa Rajampet BT Renewal to Providing BT to the road
from Naramrajupalli to Mandanapalli in
Km 0/0 to 2/6 of Rajampet (M)
21.00
Non-PMGSY
Roads Total
326.54
Kadapa Total 550.60
1 Karimnagar Choppadandi Road from Vilasagar to PR Road
Vemulawada Boinpally Via Desaipally,
Ratnampet, Ramannapet ( i.e.
20.00
Desaipally to ZP Road limits )
2 Karimnagar Dharmapuri BT Renewal to Road from Ayacut road
to Bathikepally
30.00
3 Karimnagar Husnabad BT Renewal to Road from Ghanpur to
Aknoor.
10.00
4 Karimnagar Karimnagar BT Renewal to PWD road to Nagnoor 15.00
5 Karimnagar Manakondur BT Renewal to 8/0 Km of T02 to
Devampally
26.00
6 Karimnagar Manakondur BT Renewal to R/F PWD road
Maddikunta, Kalleda
30.00
7 Karimnagar Manthani BT Renewal to R/F PWD T02 to
Brahmanpally, M.P.Mahadevpur
34.00
8 Karimnagar Manthani BT Renewal to R/F T02 to Besthapally,
M.P.Manthani
14.00
9 Karimnagar Manthani BT Renewal to R/F PWD Road
Yamanpally T01 to Konampet via
Mutharam, M.P.Mahadevpur
18.00
10 Karimnagar Manthani BT Renewal to R/F PWD Road to
Ramakistapur ZP Road via Madipally,
M.P.Manthani
7.50
11 Karimnagar Manthani BT Renewal to R/F Siripuram to
Besthapally, M.P.Manthani
5.00
12 Karimnagar Sircilla BT Renewal to R/F Kothapalli to
Sirigadha
50.00
13 Karimnagar Vemulawada BT Renewal to R/F Approach Road to Ootupalli-M.P.Kathalapur
12.00
14 Karimnagar Vemulawada BT Renewal to R/F ZP Road to
Kondapur-M.P.Konaraopet
15.00
15 Karimnagar Vemulawada BT Renewal to R/F Rudarangi to
Harizanawada-M.P.Chandurthy
7.50
PMGSY
Roads Total
294.00
1 Karimnagar Choppadandi Boinpally to Vemulawada 90.00
2 Karimnagar Husnabad BT Renewal to ZP Road Akunur to
Sarvaipet via Perkapalli
44.80
9
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
3 Karimnagar Husnabad BT Renewal to R/F Kurella to Koheda 7.50
4 Karimnagar Husnabad BT Renewal to R/F R&B road to
Mustafapoor vai Gollapally,
Bheemadevarapalli
25.00
5 Karimnagar Huzurabad BT Renewal to Jammikunta to Uppal
(via) Bheempali
100.00
6 Karimnagar Huzurabad BT Renewal to Kothapalli to kamalapur 100.00
7 Karimnagar Jagtial BT Renewal to R&B Road to BB Rao
Palli (via) Jabithapur,
58.00
8 Karimnagar Karimnagar BT Renewal to PWD road to PWD road
via Gopalpur
45.00
9 Karimnagar Korutla BT Renewal to Mogilpet to Mallapur 60.00
10 Karimnagar Manakondur BT Renewal to Molangur CADA road to
Rajapur
20.00
11 Karimnagar Manthani BT Renewal to R/F Keshanpalli to
Edulapur via Mydambanda, Machupet,
Lakkaram, Sarvaram, M.P.Muthram
(MNT)
144.00
12 Karimnagar Peddapalli BT Renewal to R/F PWD Road Nittoor
to Kodurpaka, M.P.Peddapalli
30.00
13 Karimnagar Ramagundam BT Renewal to Road from Kukkalagudur
to Potyal
90.00
14
Karimnagar Sircilla
BT Renewal to R/F PWD Road to
Chandrampet, M.P.Sircilla
25.00
15 Karimnagar Sircilla BT Renewal to Almaspur to Gollapalli 60.00
16
Karimnagar Vemulawada
BT Renewal to R/F Vemulawada to
Laxmipur, M.P.Laxmipur
20.00
17 Karimnagar Vemulawada BT Renewal to PWD Road to Rudraram 42.00
Non-PMGSY
Roads Total
961.30
Karimnagar
Total
1255.30

1 Khammam Aswaraopeta BT Renewal to R/F Aswaraopeta to
Naramvarigudem
30.00
2 Khammam Bhaddrachalam BT Renewal to R/F Cherukuru to Peruru 83.40
3 Khammam Kothagudem BT Renewal to R/F Yanambile to Prabathnagar
43.20
4 Khammam Kothagudem BT Renewal to R/F PWD road to
Rampuram
10.80
5 Khammam Madhira BT Renewal to R/F Nagulavancha to
patharlapadu
24.00
6 Khammam Madhira BT Renewal to R/F Pandillapalli to
Ananthasagar
24.00
7 Khammam Palair BT Renewal to R/F R&B road to
Kasnathanda
22.50
8 Khammam Pinapaka BT Renewal to R/F PWD road to
Ramachandrapuram
55.40
10
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
9 Khammam Sathupalli BT Renewal to R/F PWD road to
Ganeshpadu
20.00
10 Khammam Sathupalli BT Renewal to R/F Kuppenakuntla to
Janakipuram
18.00
PMGSY
Roads Total
331.30
1 Khammam Khammam BT Renewal to R/F R&B road to
Kodumuru via Rudramkota & Puttakota
80.00
2 Khammam Khammam BT Renewal to Approach road to
Manchukonda
10.00
3 Khammam Madhira BT Renewal to R/F Yerrupalem Rly.
Station to Jayanthi
95.00
4 Khammam Palair BT Renewal to R/F R&B road to Beerole
via Kakaravai, Erragadda and
Thallachervu
125.00
5 Khammam Pinapaka BT Renewal to R/F Krishnasagar Jr. 27.00
College to ST Colony
6 Khammam Wyra BT Renewal to R/F Relakayalapalli to
Tekulapalli
60.00
7 Khammam Yellandu BT Renewal to R/F
Satyanarayanapuram R & B Road to
Chinna Krishnapuram, Garla (m)
100.00
Non-PMGSY
Roads Total
497.00
Khammam
Total
828.30
1 Krishna Avanigadda BT Renewal to Road from Narapalam to
Pittalanka
46.00
2 Krishna Gudivada BT Renewal to Link road to Pedalingala
to Chinalingala from MNK road
55.00
3 Krishna Jaggaiahpeta BT Renewal to Road from Chittela to
Singavaram
19.20
4 Krishna Jaggaiahpeta BT Renewal to R/C NH9 to
Katchavaram(via) Takkellapadu.
15.00
5 Krishna Kaikaluru BT Renewal to Atapaka to
Varahapatnam
57.60
6 Krishna Machilipatnam BT Renewal to M.E Road to
Borrapathupalem
24.00
7 Krishna Mylavaram BT Renewal to Road from NH9 to
9.60
Tummalapalem.
8 Krishna Mylavaram BT Renewal to Road from MNK VV road
to Patha Naguliuru
9.60
9 Krishna Mylavaram BT Renewal to R/F I.T.road to
Gurrajupalem
20.40
10 Krishna Nandigama BT Renewal to Road from NH 9 Kesara
to S.Amaravaram
18.00
11 Krishna Nandigama BT Renewal to Road from CAD R&B
Road to Munnaluru
16.80
12 Krishna Nandigama BT Renewal to Road from Gudimetla to
Krishna river
18.00
11
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
13 Krishna Pamarru BT Renewal to Veeranki Lock to
Peanamakuru bridge
25.00
14 Krishna Pedana BT Renewal to Kaza R & B road to
Mutrasipalem
49.68
15 Krishna Pedana BT Renewal to V.S R&B road to
Guruvindagunta
9.00
16 Krishna Pedana BT Renewal to PBG(R & B) road to
Atchayyavaripalem
18.00
17 Krishna Pedana BT Renewal to PBG Road to
Nageswararaopeta
9.90
18 Krishna Pedana BT Renewal to PBG Road to
Manimeswaram
25.02
19 Krishna Pedana BT Renewal to Garsipudi R&B road to
Chandala Domlagondi
36.00
20 Krishna Tiruvuru BT Renewal to MNK road to Jeellakunta 10.00
21 Krishna Tiruvuru BT Renewal to Meduru to Kotha 60.00
Arlapadu
PMGSY
Roads Total
551.800
1 Krishna Gannavaram BT Renewal to Kalavapamula to
Vemanda
44.00
2 Krishna Machilipatnam BT Renewal to R&B Road to Tavisapudi 36.00
3 Krishna Machilipatnam BT Renewal to Machilipatnam to
Chittipalem road
35.00
4 Krishna Nuzvidu BT Renewal to Gogulampadu to East
Digavalli
50.40
5 Krishna Pamarru BT Renewal to R&B Road to
Matlamalapalli
45.00
6 Krishna Pamarru BT Renewal to R&B Raod to
Vemulamadamalapalli
30.00
7 Krishna Penamaluru BT Renewal to Penamaluru to Vanukuru 70.00
8 Krishna Penamaluru BT Renewal to Vuyyuru - Valluru road to
Vuyyuru H/w
20.00
9 Krishna Penamaluru BT Renewal to Improvements to the BT
road from KM 53/0 of VM road to
Ventrapragada (via) Jabarlapudi and
Mudunuru
46.00
Non-PMGSY
376.40
Roads Total
Krishna Total 928.20
1 Kurnool Alur BT Renewal to Providing BT surface to
the road from Karidiguddam to
Muddanageri
23.50
2 Kurnool Banaganapalli BT Renewal to Yerragudi to
Hussainapuram.
42.00
3 Kurnool Kodumur BT Renewal to Providing BT surface to
road from Varkur to Kallaparri
67.00
4 Kurnool Mantralayam BT Renewal to Providing BT surface
approach road to Ramapuram
14.00
12
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
5 Kurnool Mantralayam BT Renewal to Providing BT surface
approach road to Arlabanda 0/0 to 1/6
17.00
6 Kurnool Nandikotkur BT Renewal to Providing BT surface to
the road from Kadumur to Chowtkur
30.00
7 Kurnool Panyam BT Renewal to Providing BT surface
approach road to Durvesi.
15.00
8 Kurnool Pathikonda BT Renewal to Providing BT surface to
the road from Pagidiroy to
Ramalingayapalli
23.50
9 Kurnool Srisailam BT Renewal to Providing BT surface
road from Ernapadu to G. Singavaram
17.75
10 Kurnool Srisailam BT Renewal to BT road from KG road to
Indereswaram.
42.85
11 Kurnool Srisailam BT Renewal to Seetharamapuram to
Mothkulapalli.
16.80
12 Kurnool Srisailam BT Renewal to O.N. road to
Nandimpalli.
7.90
13 Kurnool Yemmiganur BT Renewal to Providing BT surface to
the road from Parlapalli to Guvvaladoddi
28.00
14 Kurnool Yemmiganur BT Renewal to Providing BT surface to
the road from R&B road to Bapuram
13.00
PMGSY
Roads Total
358.30
1 Kurnool Adoni BT Renewal to GPA road to Sadapuram 21.00
2 Kurnool Allagadda BT Renewal to R/F Chagalamarri to
Mundrallapalli in Km 0/0 to 1/1 of
Chagalamarri Mandal
20.00
3 Kurnool Alur BT Renewal to Chippagiri to Yerur 70.00
4 Kurnool Banaganapalli BT Renewal to Road from Perusomala
to Peddaventurla via Kammavaripalli in
Km 0/0 to 5/0 upto Kadapa district
border
65.00
5 Kurnool Dhone BT Renewal to Kurnool Bethamcherla
R&B road to Seetharampuram
72.00
6 Kurnool Nandikotkur BT Renewal to KG road to
30.00
P.Lingapuram via., Tharigopula
7 Kurnool Nandyal BT Renewal to Road from Pasurupadu
to Jillella in Km 0/0 to 4/9
80.00
8 Kurnool Panyam BT Renewal to R/f Gadivemula to
Regadiguduru road in Gadivemula(M)
116.00
9 Kurnool Pathikonda BT Renewal to Jonnagiri to Peapuly 30.00
Non-PMGSY
Roads Total
504.00
Kurnool Total 862.30
13
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
1 Mahabubnagar Alampur BT Renewal to Narayanpur to Pedda
Amudalapad
15.00
2 Mahabubnagar Alampur BT Renewal to R&B Road to Konkal 16.00
3 Mahabubnagar Alampur BT Renewal to R&B Road to Pedda
Dhanwada via Tanagala Mandoddi
40.00
4 Mahabubnagar Devarkadra BT Renewal to PWD road to Fareedpur 27.00
5 Mahabubnagar Devarkadra BT Renewal to ZP Road to Thatikonda 35.00
6 Mahabubnagar Kalwakurthy BT Renewal to PWD road to Kotra (V.R) 26.00
7 Mahabubnagar Kalwakurthy BT Renewal to PWD Road to
Charikonda (via) Mudvin
80.00
8 Mahabubnagar Kodangal BT Renewal to R/F. PWD road to
Angadiraichur (via) Chitlapally
66.00
9 Mahabubnagar Kollapur BT Renewal to R/F PWD road Singotam 60.00
to Korlakunta (via) Badugadinne
10 Mahabubnagar Kollapur BT Renewal to Tellarallapalli to
Rajapoor
28.00
11 Mahabubnagar Mahabubnagar BT Renewal to ZP.Road to Gundyal 13.00
12 Mahabubnagar Makthal BT Renewal to R/F. Maganoor to
Warkoor
13.00
13 Mahabubnagar Makthal BT Renewal to R/F. Neredigam to
Neredigamdoddi
30.00
14 Mahabubnagar Nagarkurnool BT Renewal to R/F PWD road to
Polepally
25.00
15 Mahabubnagar Nagarkurnool BT Renewal to R/F Chinnamuddanur to
Karvanga via Thallapally
50.00
16 Mahabubnagar Narayanpet BT Renewal to R/F. PWD road to
Gunmukla to Yermonipally
22.00
17 Mahabubnagar Wanaparthy BT Renewal to R/F Nagapur to
Bandaraipakula
15.00
PMGSY
Roads Total
561.00
1 Mahabubnagar Achampet BT Renewal to Polishetty Palli PWD
road to Golagundam
(via)Chennur,Kondaredypally
100.00
2 Mahabubnagar Gadwal BT Renewal to R&B Road to
36.00
Penchikalpad, Ghattu(M)
3 Mahabubnagar Gadwal BT Renewal to R&B Road to Palvai,
Dharur(M)
36.00
4 Mahabubnagar Gadwal BT Renewal to R&B Road to
Sindhanoor (via) Induvasi
72.00
5 Mahabubnagar Jadcherla BT Renewal to Road from PWD Road
at Boinpally to Mudharam via
Mallapur,Gudiganipally
100.00
6 Mahabubnagar Mahabubnagar BT Renewal to R/F Hanwada to
Kothlabad via Vepur
80.00
7 Mahabubnagar Makthal BT Renewal to PWD Road to
Motlampally Atmakur(M)
18.50
14
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
8 Mahabubnagar Makthal BT Renewal to PWD Road to Kollur 7.00
9 Mahabubnagar Narayanpet BT Renewal to PWD road to Putpak via
Eklaspur Narayanpet(M)
15.00
10 Mahabubnagar Narayanpet BT Renewal to PWD Road to
Kollampally, Narayanpet(M)
7.00
11 Mahabubnagar Narayanpet BT Renewal to PWD Road to Gadapah
via Vitalapur, Damargidda(M)
20.00
12 Mahabubnagar Shadnagar BT Renewal to R/F Shadnagar to
J.P.Darga (via) Dooskal
120.00
Non-PMGSY
Roads Total
611.50
Mahabubnaga
r Total
1172.50
1 Medak Andole BT Renewal to PWD road Uppariguda . 20.00
2 Medak Andole BT Renewal to Shivampet PWD road to
Chakriyal .
12.00
3 Medak Andole BT Renewal to PWD road to
Masanpally.
20.00
4 Medak Dubbak BT Renewal to R/F Makthamasanpally
to Begumpet via.Bangla
Venkatapur,Yelkal (2/0 - 4/0Km)
60.00
5 Medak Dubbak BT Renewal to R/F Dubbak to
Dumpalapally (0/0-1/0Km)
11.50
6 Medak Medak BT Renewal to R/F Nagsanpally PWD
road to Yedupayal temple (0/0-1/2 km)
50.00
7 Medak Narsapur BT Renewal to PWD road to Kistapur 6.00
8 Medak Patancheru BT Renewal to R/F PWD road to
Chennapur via Nallavally, Kothapally
85.00
9 Medak Sangareddy BT Renewal to SNT PWD road to
Kulabgoor .
23.40
10 Medak Siddipet BT Renewal to R/F PWD road to
Cherlankireddipally
18.00
11 Medak Siddipet BT Renewal to R/F PWD road to
Ensanpally
9.50
PMGSY
Roads Total
315.40
1
BT Renewal to PWD road to
Medak Andole
Mansapally
20.00
2 Medak Andole BT Renewal to Khammampally to
Chinnachelmeda
40.00
3 Medak Andole BT Renewal to Neredigunta to
Makthagudem
40.00
4
Medak Dubbak
BT Renewal to R&B road to R&B road
via Khangal
27.00
5 Medak Dubbak BT Renewal to R&B road Yellareddipet
to Thadkapally via Peddamasanpally
(M)
30.00
15
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
6
Medak Gajwel
BT Renewal to BT Renewal on R/F
Duddeda Road to Ankireddypally in MP
Kondapak
15.00
7 Medak Gajwel BT Renewal to R/F Gajwel to Rajiv
Rahadari via Muthrajpalli in MP Gajwel
20.00
8 Medak Gajwel BT Renewal to R/F Mulugu to
Narsampalli in MP Mulugu
20.00
9 Medak Gajwel BT Renewal to R/F Meenajipet to
Thunki Khalsa MP Wargal
20.00
10 Medak Medak BT Renewal to R/F PWD road to SC
Colony, Kothapally
5.00
11 Medak Narayankhed BT Renewal to R/F. PWD road to
Magdoompoor via Panchagaon,
Ranapur, Thumnur
120.00
12
Medak Narsapur
BT Renewal to road from Potharam to
Palata
24.00
13 Medak Narsapur BT Renewal to PWD Road at
Amsanpally to Kulcharam
60.00
14 Medak Narsapur BT renewals road from SNT PWD road to
Chinnaguttimukkala to Sinkindalapur
44.00
15 Medak Narsapur BT renewals SNT PWD road to
Pothulabogada X road of Yeldurthy road
65.40
16 Medak Patancheru BT Renewal to Road from Kodakanchi
to Indresham
30.00
17 Medak Sangareddy BT Renewal to R/F Ismailkhanpet NH9
to Erdanur
20.00
18 Medak Sangareddy BT Renewal to Ananthasagar PWD
road to Sadasivapet via.Rejinthal
18.00
19 Medak Sangareddy BT Renewal to Improvements of BT
road from Nizampur to pottipally via
Kollkur(Kolkur Limits)Nizampur to Kolkur
40.00
20 Medak Siddipet BT Renewal to R/F Narmetta to
Nangnoor (via) Ramchandrapur
44.00
21 Medak Siddipet BT Renewal to R/F PWD road to
Konaipally (via) Velkatur
36.00
22 Medak Zaheerabad BT Renewal to NH-9 to Edakulapally 60.00
23 Medak Zaheerabad BT Renewal to PWD road to Ramthirth
via Husselly
50.00
24 Medak Zaheerabad BT Renewal to Arjun naik Thanda to anegunta
60.00
Non-PMGSY
Roads Total
908.40
Medak Total 1223.80
1 Nalgonda Alair R/F Raigiri - Mothkur Road to
Athmakur Village
18.00
2 Nalgonda Devarakonda BT Renewal to R/F Devarakonda to
Kamepally via Thatikole Telugupally
173.00
3 Nalgonda Huzurnagar BT Renewal to R/F PWD road to
Sarvaram via Abbireddygudem
51.00
16
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
4 Nalgonda Huzurnagar BT Renewal to R/F Palakeedu to
Sajjapuram Thanda
42.00
5 Nalgonda Huzurnagar BT Renewal to R/F Nakkagudem to
Kistapuram
28.00
6 Nalgonda Huzurnagar BT Renewal to R/F LB Nagar to
Ramachandrapuram via Kondandaram
Puram
27.00
7 Nalgonda Kodad BT Renewal to R/F Bethole to
Acharyulagudem
42.00
8 Nalgonda Kodad BT Renewal to R/F Madjaram (NH9) to
Nelamarry
52.00
9 Nalgonda Kodad BT Renewal to R/f Hussainabad to
Burkacherla Thanda
40.00
10 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to
Iylapur (via) Nandipahad
72.00
11 Nalgonda Munugod BT Renewal to R/F Kondapur to
Nermatte
42.00
12 Nalgonda Munugod BT Renewal to R/F NH 9 to
Dharmojigudem
16.20
13 Nalgonda Munugod BT Renewal to PWD Road to
Udthalapally
24.00
14 Nalgonda Nagarjuna Sagar BT Renewal to R/F Borraipalem R&B
Road to Thimmapuram (via)
Harijathanda,kanyathanda
71.00
15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Chepur to
Theratigudem
25.00
16 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kannekal to
Dharmapuram
40.00
17 Nalgonda Nakrekal BT Renewal to R/F NH9 to Kurumarthy
via Chervuannaram
60.90
18 Nalgonda Nakrekal BT Renewal to R/F Narketpally to
Mandra
23.00
19 Nalgonda Nakrekal NH9 to Pittampally 58.80
20 Nalgonda Nakrekal R/F Urumadla to Nereda 3.50
21 Nalgonda Nalgonda BT Renewal to Addanki road to
Dacharam
48.00
22 Nalgonda Nalgonda BT Renewal to R/F PWD road to
Cherlagowraram via Darveshpur
15.60
23 Nalgonda Nalgonda BT Renewal to R/F PWD road to
Anneparthy
30.00
24 Nalgonda Nalgonda Sagar PWD Road to Chinnamadaram
50.00
via Chetlachennaram
25 Nalgonda Suryapet BT Renewal to Dupahad to Mukundapur 100.00
26 Nalgonda Suryapet BT Renewal to R/F shanti Nagar to
Kusumavarigudem via Dasaigudem,
Kesaram
72.00
27 Nalgonda Thungathruthy PWD road to Monsingtanda via
Thallasingaram,Somla tanda
86.25
28 Nalgonda Thungathruthy PWD road to Uyyalawada 60.00
17
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
29 Nalgonda Thungathruthy BT Renewal to Donabanda x road to
Shaligowraram
zp road
18.23
30 Nalgonda Thungathruthy BT Renewal to BT R/F R&B Road to
Itukalapahad
45.00
PMGSY
Roads Total
1434.48
1 Nalgonda Alair BT Renewal to R/F Alair to
Ammanabole road to Motakondur via
Dilawarpur
72.00
2 Nalgonda Alair BT Renewal to R/F RM Road at
Athmakur to Anantharam via Koratikal
36.00
3 Nalgonda Bhongir BT Renewal to Anantharam to
Hanumapuram (balance work)
10.00
4 Nalgonda Bhongir BT Renewal to NH 9 to Saibrindavanam
(via) Deshmukh
70.00
5 Nalgonda Devarakonda BT Renewal to R/f Devarakonda- 10.00
Mahaboob Nagar PWD road to
Seripally road
6 Nalgonda Huzurnagar BT Renewal to R/F Merlllacheruvu to
Vepala Madharam
26.00
7 Nalgonda Huzurnagar BT Renewal to R/F PWD Road to
Karakkayalagudem via
Madhavarayanigudem
35.00
8 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to
Dilawarpur (via) Chinthapally
40.00
9 Nalgonda Munugod BT Renewal to R/F Nagaram PWD
Road to Nagaram (via) Turupugudem
76.80
10 Nalgonda Munugod BT Renewal to R/F Donipamula to
Thummalapalli (via)
Thimmareddygudem
30.00
11 Nalgonda Nagarjuna Sagar BT Renewal to B/W R/F pulicherla to
Peddagummadam (via) Gemyanaik
thanda
29.00
12 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjunasagar
PWD Road to Marlagadda (via)
Pulimamidi
55.00
13 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kompally PWD road
to Yellapuram
16.00
14 Nalgonda Nagarjuna Sagar BT Renewal to R/F PWD road to
Palem
3.00
15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Thimmapur to Kachavarigudem
15.00
16 Nalgonda Nagarjuna Sagar BT Renewal to R/F MLG DVK PWD
road to Anumula
12.00
17 Nalgonda Nagarjuna Sagar BT Renewal to R/F LNG MBNR PWD
road to Pittalagudem
15.00
18 Nalgonda Nagarjuna Sagar BT Renewal to R/F Tripuraram to
Bejjikal
15.00
19 Nalgonda Nagarjuna Sagar BT Renewal to R/F Velmagudem to
Sirsangandla via Basireddypally
32.00
20 Nalgonda Nagarjuna Sagar BT Renewal to R/F Pothunur to
Pulicherla
50.00
18
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
21 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kanekal PWD road
to Yerraballi
25.00
22 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjuna Sagar
PWD road to Chintalapalem
7.00
23 Nalgonda Nalgonda BT Renewal to Constn. Of Cause way
across Kanagal Vagu at Thimmannguda
33.18
Non-PMGSY
Roads Total
712.98
Nalgonda
Total
2147.46
1 Nizamabad Armoor BT Renewal to Baduguna to Ch
Kondoor Crosing
10.00
2 Nizamabad Armoor BT Renewal to ROAD FROM PIPRI TO
MANTHANIUPGRADATION
14.10
3 Nizamabad Balkonda BT Renewal to Manal toGairigutta
thanda
35.00
4 Nizamabad Banswada BT Renewal to PWD Road to Borlam
Near Bus depot
22.00
5 Nizamabad Banswada BT Renewal to R/F Birkur Pothangal
road to Barengedgi
20.00
6 Nizamabad Bodhan BT Renewal to R/F: PWD Road to
Bagepally vai Kunepally
30.00
7 Nizamabad Bodhan BT Renewal to Approach Road to
Jamalam
5.00
8 Nizamabad Bodhan BT Renewal to PWD road to Posani
Kunta Ootpalli
10.00
9 Nizamabad Jukkal BT Renewal to PWD road to Koma
lancha
22.00
10 Nizamabad Jukkal BT Renewal to SNA PWD road to
Rajula Via Bich kunda
25.00
11 Nizamabad Kamareddy BT Renewal to N.H.7 to Jangampally 9.00
12 Nizamabad Kamareddy BT Renewal to Janagam Marry to
Mohammada poor
14.60
13 Nizamabad Kamareddy BT Renewal to N.H. Way 7 to
Kyasampally
14.00
14 Nizamabad Kamareddy BT Renewal to PWD road to
Bhagirthpally
10.00
15 Nizamabad Nizamabad
Rural
BT Renewal to PWD Road to Mallapur 22.00
16 Nizamabad Nizamabad
BT Renewal to PWD Road to Lolam
28.00
Rural
(via) Yellareddypalli
17 Nizamabad Nizamabad
Rural
BT Renewal to R/f Mailaram to
Chintaloor
20.00
18 Nizamabad Nizamabad
Rural
BT Renewal to PWD Road to
Ansanaplly
10.00
19 Nizamabad Yellareddy BT Renewal to Yellareddy to Somarpet 11.50
20 Nizamabad Yellareddy BT Renewal to PWD road to Pothangal
Kalan
10.00
21 Nizamabad Yellareddy BT Renewal to ZP road to Mathu
Sangem
13.50
19
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
PMGSY
Roads Total
355.70
1 Nizamabad Armoor BT Renewal to Ch.Kondur to Badguna 54.00
2 Nizamabad Balkonda BT Renewal to Konasamudram X Road
to Ameernagar via Dammannapet and
Narsapur
70.00
3 Nizamabad Banswada BT Renewal to R/F:Strengthening R/F
Bakarfarm to Sunkini road via Digu
Farm
40.00
4 Nizamabad Bodhan BT Renewal to Balance work Road from
Nizampoor to Naleshwer
8.00
5 Nizamabad Bodhan BT Renewal to Approach Road Bodhan
to Mosra Road via Anil Talkies
10.00
6 Nizamabad Bodhan BT Renewal to PWD Road to Pandu
Form via Achenpally
10.00
7 Nizamabad Bodhan BT Renewal to R/F: Bandarpally X Road
Chinna Mavandi via Pedda Mavandi
32.00
8 Nizamabad Kamareddy BT Renewal to NH - 44 to Anthampally 20.00
9 Nizamabad Nizamabad
Rural
BT Renewal to PWD road to Kulaspoor
thanda
16.00
10 Nizamabad Nizamabad
Rural
BT Renewal to ZP road Gundaram to
Sastrinagar
20.00
11 Nizamabad Nizamabad
Rural
BT Renewal to Approach road to
Tanakurd
8.00
12 Nizamabad Yellareddy BT Renewal to NH-7 to Thirmanpally via
Markal
30.00
Non-PMGSY
Roads Total
318.00
Nizamabad
Total
673.70
1 Prakasam Addanki BT Renewal to Uppumagulur to
Somavarappadu.
35.00
2 Prakasam Darsi BT Renewal to Rajampalli East
Gayavaram R&B Road to T.S.Puram
20.00
3 Prakasam Darsi BT Renewal to R&B Road to Polavaram 20.00
4 Prakasam Kondepi BT Renewal to R/f Ankarlapudi to
30.00
Mupparajupalem
5 Prakasam Markapur BT Renewal to Road from Rayavaram
to Kethagudipi (via) Goguladinne
15.00
6 Prakasam Ongole BT Renewal to Road from
Vengamukkapalem - Konijedu (via)
Survereddypalem.
50.00
7 Prakasam Parchur BT Renewal to Eddanapudi to
Vinjanampadu.
45.00
8 Prakasam Parchur BT Renewal to NH5 to Ananthavaram 45.00
9 Prakasam S.N.padu BT Renewal to Road from
Ammanabrolu to Pamidipadu
(Ommivaram to old Madras Road).
20.00
20
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
PMGSY
Roads Total
280.00
1 Prakasam Addanki BT Renewal to Sajjapuram to
Karumanchi (via) Elchuru
15.00
2 Prakasam Darsi BT Renewal to Talluru to Kunkupadu 40.00
3 Prakasam Darsi BT Renewal to Dosakayalapadu to
Lakkavaram
15.00
4 Prakasam Giddaluru BT Renewal to Komorole to
Chintalapally (via) Purushothampalli,
K.Bonthapally
90.00
5 Prakasam Kandukur BT Renewal to Road from Gudlur to RC
Agraharam
100.00
6 Prakasam Kanigiri BT Renewal to OV road to
Rangampeta R&B road
70.00
7 Prakasam Kondepi BT Renewal to R/f Konijedu to Ponduru 25.00
8 Prakasam Markapur BT Renewal to Markapuram to
Gajjalakona Via Naidu pally
30.00
9 Prakasam S.N.padu BT Renewal to OK road to Busarapalli 35.00
10 Prakasam Y.Palem BT Renewal to Yerragonda Palem R&B
Road to Pullalacheruvu
80.00
Non-PMGSY
Roads Total
500.00
Prakasam
Total
780.00
1 Ranga Reddy Chevella BT Renewal to R/M & BT on R/F PWD
Road to Yetla Erravelly
20.00
2 Ranga Reddy Maheshwaram BT Renewal to R/F Ameerpet to
Manikyamguda,Maheswaram (M)
20.00
PMGSY
Roads Total
40.00
1 Ranga Reddy Chevella BT Renewal to R/F Shankerpally PWD
Road to Tangutur
20.00
2 Ranga Reddy Chevella BT Renewal to R/F PWD Road to
Yellakonda (Via) Lingampally
20.00
3 Ranga Reddy Chevella BT Renewal to R/F PWD Road to
Gopularam
15.00
4 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Mangalpally
Patelguda to Sahebguda
25.00
5 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Nerapally to Majeedpur
20.00
6 Ranga Reddy Ibrahimpatnam BT Renewal to R/f Polkampalli to
Dhandimyalaram (via) Narapally of
Ibrahimpatnam mandal
30.00
7 Ranga Reddy Ibrahimpatnam BT Renewal to Peddaamberpet to
Pasumanula of Hayatnagar Mandal
30.00
8 Ranga Reddy Ibrahimpatnam BT Renewal to Adibatla to Nadergul 10.00
9 Ranga Reddy Maheshwaram BT Renewal to R/F Kandukur X Road to
Meerkhanpet
50.00
21
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
10 Ranga Reddy Maheshwaram BT Renewal to R/F PWD Road to
Gudur
35.00
11 Ranga Reddy Maheshwaram BT Renewal to R/F PWD Road to
Jalpally, Saroornagar (M)
20.00
12 Ranga Reddy Maheshwaram BT Renewal to Agalmiyaguda to
Thimmapur road, Kandukur (M)
35.00
13 Ranga Reddy Maheshwaram BT Renewal to Maheswaram to
Kavalanibavithanda, Maheswaram (M)
25.00
14 Ranga Reddy Medchal BT Renewal to S/R to R/F CRPF Gate-II
to ZP Road at Jawaharnagar of
Shameerpet mandal
81.00
15 Ranga Reddy Pargi BT Renewal to R/F PWD Road to
Enkepally
20.00
16 Ranga Reddy Pargi BT Renewal to R/F PWD Road to
Kankal via Pedda Ummental
70.00
17 Ranga Reddy Pargi BT Renewal to PWD Road to 16.00
Dharmapuram
18 ranga Reddy Pargi BT Renewal to Mahammadabad PWD
Road to Ramalayam
3.00
19 Ranga Reddy Quthbullapur BT Renewal to R/F Dulapally to
Jeedimetla Industrial Area
36.00
20 Ranga Reddy Quthbullapur BT Renewal to R/F Narsapur PWD
Road to Nuthankal PWD Road via D.P.
Pally, Dundigal, Nagloore
90.00
21 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road to
Sultanpally
36.00
22 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road Famaish
Hotel to Hydershakote janda X Road
12.00
23 Ranga Reddy Tandur BT Renewal to Renewal BT on R/F
Peddemul to Siddana madugu tanda up
to Nagulapally for 3.50 laid in the Year
2001 from 0/0-2/8&3/9-4/6s
72.00
24 Ranga Reddy Vikarabad BT Renewal to Renewal BT on R/F
PWD Road Kerelly to Nagaram via
Zaidpally Tharigoppula
120.00
Non-PMGSY
Roads Total
891.00
Ranga Reddy
Total
931.00
1 SPSR Nellore Atmkur BT Renewal to NB road to Thikkavaram 60.00
2 SPSR Nellore Atmkur BT Renewal to R&B road to Pallipalem
of Annareddypalem
9.00
3 SPSR Nellore Gudur BT Renewal to Road from MC Road tod
G-Y Road (Via) Potupalem
35.00
4 SPSR Nellore Kavali BT Renewal to RI Road to Allur
Galidibbalu
35.00
5 SPSR Nellore Sullurupeta BT Renewal to N.D Road to Nellorepalli 50.40
22
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
6 SPSR Nellore Survepalli BT Renewal to Venkatachalam-
Kasumuru road to N.P road via
kandalapadu, Pullatheegalapadu and
Siddavarappadu
40.00
7 SPSR Nellore Survepalli BT Renewal to MC Road to Pidur 40.00
8 SPSR Nellore Udayagiri BT Renewal to Chinannalur to
Krishnareddy palem (via) Thoguru
vanaipalem T.Malapalem
23.30
9 SPSR Nellore Udayagiri BT Renewal to KU road to
Lakshmipuram (via) Kammavari palem
32.00
10 SPSR Nellore Venkatagiri BT Renewal to V-R road to Chapalapalli 26.15
PMGSY
Roads Total
350.85
1 SPSR Nellore Kovur BT Renewal to Providing B.T.Renewal 21.50
road from Chowkacherla to Pallipalem
in Vidavalur Mandal.
2 SPSR Nellore Nellore Rural BT Renewal to Nellore to Mutkur road
(via) Rajupalem, Chintareddypalem &
Vaviletipadu
100.00
3 SPSR Nellore Sullurupeta BT Renewal to Road from M-M road to
IT road (via) Manganellore and SM
Tageli
30.00
4 SPSR Nellore Survepalli BT Renewal to Providing B.T. Renewal
road from Macherlavaripalem branch
road in T.P.Gudur Mandal
25.00
5 SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal
to Koverapalem branch road in
T.P.Gudur (M)
16.00
6 SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal
to Kothapalem branch road (via)
Potlapudi in T.P.Gudur (M)
35.00
7 SPSR Nellore Venkatagiri BT Renewal to Utukur to Perumallapadu 51.60
Non-PMGSY
Roads Total
279.10
SRSP Nellore
Total
629.95
1 Srikakulam Amadalavalasa BT Renewal to Kintali to Kajipeta 13.00
2 Srikakulam Ichapuram BT Renewal to Road from Innisupeta to Rajapuram
16.00
3 Srikakulam Palakonda BT Renewal to A.B.Road to Keesari 50.00
4 Srikakulam Pathapatnam BT Renewal to P.T.Road to Thampa 20.00
5 Srikakulam Pathapatnam BT Renewal to T.G.Road to Karajada 6.00
6 Srikakulam Pathapatnam BT Renewal to A B Road to Miriapalli
via Turakapeta
13.00
7 Srikakulam Pathapatnam BT Renewal to A.B.Road to Irapadu 10.00
8 Srikakulam Rajam BT Renewal to VP Road to AV Puram
via Sirlam
28.00
23
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
9 Srikakulam Rajam BT Renewal to U/G to the road from
M.S. puram to Peddimpeta (Via)
Kopparavalasa and Polinaiduvalasa.
(VR)
68.00
10 Srikakulam Srikakulam BT Renewal to Mittannapeta to
Balarampuram
26.00
11 Srikakulam Srikakulam BT Renewal to C.S.P road to NH5 (via)
Gudem,Chapuram
66.00
12 Srikakulam Tekkali BT Renewal to NH5 to Badagam 30.00
PMGSY
Roads Total
346.00
1 Srikakulam Amadalavalasa BT Renewal to Road from CSP road to
Dusi R&B road via Vanjangi and
Vanjagipeta
42.00
2 Srikakulam Etcherla BT Renewal to NH5 to Kuppili Road 56.00
3 Srikakulam Ichapuram BT Renewal to NH5 to Jagati Silagam
road via Dasariputtuga silagam
50.00
4 Srikakulam Narasannapeta BT Renewal to NH5 to Potayyavalasa 20.00
5 Srikakulam Palasa BT Renewal to BT road Yerramukkam
to Ratti via Marripadu
42.00
6 Srikakulam Srikakulam BT Renewal to Road from Killipalem to
Kunduvanipeta
56.00
Non-PMGSY
Roads Total
266.00
Srikakulam
Total
612.00
1 Visakhapatna
m
Anakapalli BT Renewal to Providing BT road to
Rajupalem to Gorlevanipalem via.
Valluru
21.00
2 Visakhapatna
m
Anakapalli BT Renewal to Atcherla to
Gokivanipalem
28.00
3 Visakhapatna
m
Anakapalli BT Renewal to Tumpala to AKP-CDM
road via Dibbapalem
36.80
4 Visakhapatna
m
ArakuVally BT Renewal to R/f Bakuru to Patigaruvu 15.00
5 Visakhapatna
m
ArakuVally BT Renewal to R & B road to Kilagada 16.00
6 Visakhapatna
m
Bheemili BT Renewal to R/f NH5 to
Kummaripalem via. Yathapeta
24.96
7 Visakhapatna
Bheemili BT Renewal to Vijayanagaram-Sontyam
24.00
m
road to Buddivalasa(Nerallvalasa)
8 Visakhapatna
m
Chodavaram BT Renewal to Chodavaram to
Damanapalli
38.40
9 Visakhapatna
m
Chodavaram BT Renewal to R.E.C. Road to
P.Bheemavaram
8.00
10 Visakhapatna
m
Madugula BT Renewal to K.Kotapadu to
Medicharla
20.00
11 Visakhapatna
m
Madugula BT Renewal to Jaithavaram to
Dibbapalem
25.60
12 Visakhapatna
m
Narsipatnam BT Renewal to NRPM- Tuni road to
Manyapu-ratla
24.00
24
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
13 Visakhapatna
m
Narsipatnam BT Renewal to Makavarapalem R&B
road to PP Agraharam & Adduruwada
22.40
14 Visakhapatna
m
Narsipatnam BT Renewal to Narsipatnamrevupolavaram
R& B road to
Dharmasagaram
12.80
15 Visakhapatna
m
Narsipatnam BT Renewal to Narsipatnam-Tuni R&B
road to MB Patnam
12.80
16 Visakhapatna
m
Narsipatnam BT Renewal to Narsipatnam-Tuni R&B
road tomanyapuratal( Balance reach)
4.80
17 Visakhapatna
m
Paderu BT Renewal to R&B road to Gopavaram 16.00
18 Visakhapatna
m
Paderu BT Renewal to PL Road to Vanjari 14.80
19 Visakhapatna
m
Payakaraopeta BT Renewal to Approach road to
Vemagiri
16.00
20 Visakhapatna
m
Pendurthi BT Renewal to R/f AKP-SBM to Iruwada 17.60
21 Visakhapatna
m
Pendurthi BT Renewal to R/f SBMVenkannapalem
road to
Pedayathapalem via. A.Sirasapalli
15.40
22 Visakhapatna
m
Yellamanchili BT Renewal to Kattubolu to Murakada 20.00
23 Visakhapatna
m
Yellamanchili BT Renewal to R/f AKP-Pudimadaka
road to Arabupalem
8.00
PMGSY
Roads Total
442.36
1 Visakhapatna
m
Anakapalli BT Renewal to Providing BT to the road
from Nh-5 to Valluru via Rajupalem
(Balance length other than PMGSY)
28.00
2 Visakhapatna
m
Bheemili BT Renewal to BN road to Kothavalasa
via Ramavaram BD Palem
36.80
3 Visakhapatna
m
Paderu BT Renewal to Koyyuru to Revalla 48.00
4 Visakhapatna
m
Paderu BT Renewal to Pentapadu to
Damanapalli
8.00
5 Visakhapatna
m
Payakaraopeta BT Renewal to NH-5 to Devavaram 19.00
6 Visakhapatna m
Pendurthi BT Renewal to BN road to Sabbavaram-
AKP road via Nallaregulapalem,
Balijapalem & Ammulapalem
50.00
7 Visakhapatna
m
Yellamanchili BT Renewal to PNR Peta to
Mulakalapalli, Etikoppaka ring road
45.00
Non-PMGSY
Roads Total
234.80
Visakhapatna
m Total
677.16
1 Vizianagaram Bobbili BT Renewal to NH43 to Kottakki 20.00
25
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
2 Vizianagaram Cheepurupalli BT Renewal to GB road to Sivaramparla
road (via) Devada and Nadipenapeta
60.00
3 Vizianagaram Cheepurupalli BT Renewal to GG road to
Ippalavalasa
40.00
4 Vizianagaram Cheepurupalli BT Renewal to Garividi Garbham road
to Pedabantupalli via Routhupeta (MP)
30.00
5 Vizianagaram Cheepurupalli BT Renewal to R/f Alugolu to Konuru via
Ragolu (MP)
30.00
6 Vizianagaram Cheepurupalli BT Renewal to Puthikapeta to
Chintalapeta
27.00
7 Vizianagaram Cheepurupalli BT Renewal to G.G.Road to
Chinabantupalli
8.00
8 Vizianagaram Gajapathinagara
m
BT Renewal to NH43 to Keratam (via)
Billalavalasa (2/0 to 4/0)
20.00
9 Vizianagaram Nellimerla BT Renewal to Nellimarla-Moida R&B 20.00
road to Garikivalasa (via)
Kondagumpam
10 Vizianagaram Parvathipuram BT Renewal to Road from SH 36 to
Yegotivalasa
80.00
11 Vizianagaram Salur BT Renewal to Kothavalsa to
Mirthivalasa
35.00
12 Vizianagaram Vizianagaram BT Renewal to V.K.road to Pedavemali
Jn (via) Korukonda & Korukondapalem
55.00
PMGSY
Roads Total
425.00
1 Vizianagaram Cheepurupalli BT Renewal to CPP Laveru road to
Ardivalasa
45.00
2 Vizianagaram Gajapathinagara
m
BT Renewal to V.B.road to PSR puram
(via) Korlam
50.00
3 Vizianagaram Gajapathinagara
m
BT Renewal to NH43 to Donkinavalasa
(via) Chowdantivalasa
12.00
4 Vizianagaram Kurupam BT Renewal to DL Puram to Jumbiri. 15.00
5 Vizianagaram Nellimerla BT Renewal to Munginapalli to
Nellimarla (via) Saripalli
50.00
6 Vizianagaram Salur BT Renewal to NH43 to Gadivalasa 40.00
Non-PMGSY
212.00
Roads Total
Vizianagaram
Total
637.00
1 Warangal Bhupalpally BT Renewal to Chinnakodepaka to
Gollapalli via Balaiahpalli
19.00
2 Warangal Bhupalpally BT Renewal to R&B Road to
Vellampally
17.60
3 Warangal Ghanpur (Stn) BT Renewal to Raghunathpally to Veldi 28.50
4 Warangal Jangaon BT Renewal to Thallathanda to
Machupahad
18.75
26
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
5 Warangal Jangaon BT Renewal to PWD Road to Obula
Keshavapur
33.25
6 Warangal Mulug BT Renewal to ZP Road to Ramnagar
(Koyagudem)
9.50
7 Warangal Narsampet BT Renewal to PWD Road to
Gundlpadh
19.00
8 Warangal Palakurthy BT Renewal to Thorrur to Chintalapally 4.75
9 Warangal Palakurthy BT Renewal to ZP Road to
Sirisannagudem
7.60
10 Warangal Parkal BT Renewal to Elugur Rangampet to
Nallabelly via Mondrai
29.35
11 Warangal Wardhannapet BT Renewal to Somidi to Subbayyapalli 15.77
PMGSY
Roads Total
203.07
1 Warangal Bhupalpally BT Renewal to Vasanthapur to 40.00
Gorikothapally
2 Warangal Bhupalpally BT Renewal to PWD Road to
Subbakkapally
8.00
3 Warangal Dornakal BT Renewal to Pagidipally to
Bavojithanda
70.00
4 Warangal Ghanpur (Stn) BT Renewal to Komatigudem to
Kanchanpally
50.00
5 Warangal Ghanpur (Stn) BT Renewal to PWD Road to Chilpur 40.00
6 Warangal Jangaon BT Renewal to R&B Road Komuravelli
to Rajiv Rahadari Khaman
48.00
7 Warangal Jangaon BT Renewal to Solipur to Ankushapur 12.00
8 Warangal Mahabubabad BT Renewal to Kesamudram PWD road
to Nellikudur PWD Road via
Kalwala,Narayanpur
130.00
9 Warangal Mulug BT Renewal to R&B Road Mangapet to
Kothur
51.30
10 Warangal Palakurthy BT Renewal to Nellutla to Nanchari
Madur from Km 18/0 to 49/0
80.00
11 Warangal Parkal BT Renewal to Kamaram to Neerukulla 35.20
12 Warangal Wardhannapet BT Renewal to SH-7 to Madipally 58.43
13 Warangal Wardhannapet BT Renewal to PWD Road to Madipalli (via) Anantasagaram
35.00
Non-PMGSY
Roads Total
657.93
Warangal
Total
861.00
1 West Godavari Denduluru BT Renewal to Maheswarapuram to
Manuru
25.00
2 West Godavari Denduluru BT Renewal to Katlampudi village road 33.00
3 West Godavari Gopalapuram BT Renewal to Gopalapuram to Bhimole 62.00
27
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
4 West Godavari Narasapur BT Renewal to R&B road to
Lakkuvarithota H/o Ramannapalem
15.00
5 West Godavari Nidadavole BT Renewal to Kanuru Agraharam to
Nadupalli kota
110.00
6 West Godavari Palakol BT Renewal to Mattaparru to
Penumadam
45.00
7 West Godavari Polavaram BT Renewal to R&B Road to
T.Narsapuram
22.00
8 West Godavari Tanuku BT Renewal to Tanuku -Bhimavaram
R&B road to Indira Nagar of Relangi via
kethavaripalem
25.00
9 West Godavari Undi BT Renewal to Gollalakoderu to
Mahadevapatnam
20.00
10 West Godavari Unguturu BT Renewal to Bhimadole to
Lingampadu
16.00
PMGSY
Roads Total
373.00
1 West Godavari Achanta BT Renewal to Penugonda Deva
Z.P.Road
125.00
2 West Godavari Bhimavaram BT Renewal to Road from Konithiwada
to Rayakuduru in Veeravasaram (M)
35.00
3 West Godavari Bhimavaram BT Renewal to Dirusumarru Village
Road in Bhimavaram(M)
15.00
4 West Godavari Bhimavaram BT Renewal to Road from Balepalli R&B
Road to NREGS Road in Veeravasaram
(M)
10.00
5 West Godavari Chintalapudi BT Renewal to Jeelakarragudem to
Kamavarapukota (via) K.S.Ramavaram
50.00
6 West Godavari Chintalapudi BT Renewal to Jangaraddygudem to
Pangidigudem
30.00
7 West Godavari Denduluru BT Renewal to Road from Duggirala to
Chuttugunta
21.00
8 West Godavari Eluru BT Renewal to road from NH5 to
Satrampadu
35.00
9 West Godavari Kovvuru BT Renewal to Pasivedala to Arikirevula 27.00
10 West Godavari Narasapur BT Renewal to Road from Mogaltur to
Rajugarithota
25.00
11 West Godavari Palakol BT Renewal to Abbirajupalem to
47.00
Doddibatla road
12 West Godavari T.P.gudem BT Renewal to Jatlapalem Palem to
Mongipadu
40.00
13 West Godavari T.P.gudem BT Renewal to Navabpalem to
Pattempalem (12/4-17/4)
75.00
14 West Godavari Tanuku BT Renewal to R/F Pekeru to R.
Khandrika
45.00
15 West Godavari Undi BT Renewal to Road from R&B road to
Komatigunta Village
10.69
16 West Godavari Unguturu BT Renewal to Bhimadole to
Kurellagudem via Vadlapatla
85.00
28
Sl
No.
District Constituency Name of the work
Amount in
Rs.Lakhs
BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13
Non-PMGSY
Roads Total
675.69
West
Godavari
Total
1048.69
State Total 20865.12
PRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED::BY ORDER//
SECTION OFFICER
C.R. BISWAL
29
No of
works
Amount No of
works
Amount No of
works
Amount
1 Adilabad 3 56.00 15 649.80 18 705.80
2 Anantapur 12 295.40 11 643.58 23 938.98
3 Chittoor 24 548.75 26 709.70 50 1258.45
4 East Godavari 17 452.53 17 579.50 34 1032.03
5 Guntur 16 324.60 19 786.30 35 1110.90
6 Kadapa 9 224.06 10 326.54 19 550.60
7 Karimnagar 15 294.00 17 961.30 32 1255.30
8 Khammam 10 331.30 7 497.00 17 828.30
9 Krishna 21 551.80 9 376.40 30 928.20
10 Kurnool 14 358.30 9 504.00 23 862.30
11 Mahabubnagar 17 561.00 12 611.50 29 1172.50
12 Medak 11 315.40 24 908.40 35 1223.80
13 Nalgonda 30 1434.48 23 712.98 53 2147.46
14 Nizamabad 21 355.70 12 318.00 33 673.70
15 Prakasam 9 280.00 10 500.00 19 780.00
16 Ranga Reddy 2 40.00 24 891.00 26 931.00
17 SPSR Nellore 10 350.85 7 279.10 17 629.95
18 Srikakulam 12 346.00 6 266.00 18 612.00
19 Visakhapatnam 23 442.36 7 234.80 30 677.16
20 Vizianagaram 12 425.00 6 212.00 18 637.00
21 Warangal 11 203.07 13 657.93 24 861.00
22 West Godavari 10 373.00 16 675.69 26 1048.69
309 8563.595 300 12301.52 609 20865.12
Abstract of BT Renewals Under MRR Grant
District For Non -PMGSY Total
Roads